Roof Replacement in Sterling Gate, Alabaster, AL: Two-Story Home in Two Days

In March 2026, Prime Roofing & Restoration replaced the roof on a two-story home in the Sterling Gate neighborhood of Alabaster, in Shelby County, Alabama. After a February inspection, the crew tore off and replaced the whole roof on March 5 and 6.

Project at a glance

  • Location: Sterling Gate, Alabaster, Shelby County, AL
  • Inspection: February 13, 2026
  • Installed: March 5 to 6, 2026
  • Home: Two-story home with a raised rear deck
  • Service: roof replacement
  • Roof: New architectural shingles over synthetic underlayment

About Sterling Gate

Sterling Gate is a neighborhood in the Maylene area of southern Alabaster. Shelby County tax maps list close to 375 parcels recorded under Sterling Gate plat names, including the Cedar Grove at Sterling Gate sections.

About Alabaster

Alabaster is Prime Roofing’s home town. See our Alabaster roofing page.

Before: what the inspection found

The back of the home and deck before the new roof in Sterling Gate, Alabaster, AL
The back of the home and deck before the new roof

The challenge: a tall two-story roof over a deck

Two-story homes with a raised deck below are harder to re-roof safely: debris has to be kept off the deck and away from the doors, and the crew works from a steeper, taller roof edge.

The shingles were staged on the driveway, the deck was protected, and the tear-off and new roof were finished over two days.

What we did

  1. Inspected the roof in February and documented its condition.
  2. Delivered and staged the new shingles on the driveway.
  3. Protected the deck and landscaping.
  4. Tore off the old roof and checked the decking.
  5. Installed synthetic underlayment and leak barrier.
  6. Installed new architectural shingles.
  7. Cleaned up and photographed the finished roof by drone.

During the job

Shingles delivered and staged for the job in Sterling Gate, Alabaster, AL
Shingles delivered and staged for the job
Synthetic underlayment covering the roof in Sterling Gate, Alabaster, AL
Synthetic underlayment covering the roof
New shingles going on in Sterling Gate, Alabaster, AL
New shingles going on

The finished roof

The front of the home with its finished roof in Sterling Gate, Alabaster, AL
The front of the home with its finished roof
The finished roof above the rear deck in Sterling Gate, Alabaster, AL
The finished roof above the rear deck
Drone view of the new roof in Sterling Gate, Alabaster, AL
Drone view of the new roof
Another drone view of the finished roof in Sterling Gate, Alabaster, AL
Another drone view of the finished roof

Why these materials

Architectural (dimensional) shingles are made from two laminated layers, so they are thicker and heavier than the old flat 3-tab shingles many Birmingham-area homes started with. Prime Roofing is an Owens Corning Preferred Contractor and also installs other major brands; see our asphalt shingle roofs page for the options.

Synthetic underlayment goes over the whole deck under the shingles. It is lighter and more tear-resistant than old felt paper, it lies flat in the heat, and it gives the roof a second layer of water protection if a shingle is ever damaged.

A self-adhering leak barrier is used in the spots where water collects or changes direction: valleys, around chimneys, along walls and around pipes. It seals around each nail, which is why it goes where leaks usually start.

Keeping your roof in good shape

  • Check the roof from the ground after every hailstorm or strong wind. The National Weather Service office in Birmingham, which is based at the Shelby County Airport in Calera, issues the severe thunderstorm and hail warnings for this part of central Alabama.
  • Keep gutters and downspouts clear, especially in fall, so water does not back up under the first row of shingles.
  • Trim tree limbs back at least 6 to 10 feet from the roof. Limbs that rub the shingles wear off the granules that protect them.
  • Look at pipe boots and roof vents once a year. Rubber pipe boots dry out in the Alabama sun long before the shingles do.
  • If you see a ceiling stain, call right away. A small leak at a flashing is a quick fix, while wet decking left for months is not.

Frequently asked questions

Most homes Prime Roofing re-roofs are torn off and covered in one day, with cleanup and a final check the same day or the next morning. Bigger or steeper roofs can take a second day.

The crew covers the deck and the area below the roof edge with tarps and works debris away from doors and railings. Magnetic sweepers pick up nails at the end of each day.

After the tear-off the crew walks the bare decking. Rotten, soft or broken boards are cut out and replaced with new sheathing before any underlayment goes down, so the new shingles have a solid base to nail into.

Yes. Our office is in Alabaster. See our Alabaster roofing services.

Planning a roof replacement in Alabaster?

See our Alabaster roofing services, read about roof replacement, or request a free roof estimate.

Prime Roofing & Restoration

Owner-led roofing contractor based at 5 Brown Cir in Alabaster, serving Birmingham, Hoover, Pelham and the rest of the metro. Owens Corning Preferred Contractor.

Call (205) 661-8190

Free roof inspections. Insurance claim help after hail and storms.

Get a Free Roof Inspection

Tell us about your roof and we’ll call to set a time.

More Roofing Jobs Near You

Prime Roofing & Restoration

Business Hours
Monday: Open 24 hours
Tuesday: Open 24 hours
Wednesday: Open 24 hours
Thursday: Open 24 hours
Friday: Open 24 hours
Saturday: Open 24 hours
Sunday: Open 24 hours

Your Elite Commercial and Residential Roofing Team in Alabama